• Contattaci: +39 02 30316328

    G-Park Villaverde

    Mille :

    G-Park Villaverde is a last-mile “built to suit” project that offers a NZ 9.5 industrial site of 70,401 sq.m. with a buildability ratio of 2 sq.m./1sq.m. and a height of 20m or 5 stories. This project aims to cover the demand of logistics and distributions spaces, for clients with top quality standards conscious of energetic and sustainable in logistics real estate. G/Park Villaverde fits all urban regulations and specifications demanded by biggest logistics operators, distribution and transportation companies, as well as retailers and final users who perform their logistics inhouse, due to its great connections and proximity to Madrid. This G-Park is located in in the metropolitan area of the city of Madrid, with the possibility of local coverage, thanks to its super Prime location and with excellent access from the M-40 ring road, and being only 10km or 36 ‘by bike from kilometer zero of Madrid.

     

     

     

     

    Flexibility to carry out a warehouse adjusted to client’s needs. In the first instance, Gazeley proposes to develop two buildings of 20,279 m² and 11.724 m2, amounting a total GLA of 35.731 m2

    Warehouse 1

    Total available space

    757,790 SQ FT (70,401 SQ M)

    Warehouse 1

    218,281 SQ FT (20.279 SQ M)

    Office

    23,293 SQ FT (2.164 SQ M)

    Technical rooms

    721 SQ FT (67 SQ M)

    Dock doors

    24

    Level Access Doors

    2

    Car Park

    258

    HGV Parking

    15

    Floor Loading Capacity

    5tn/sqm

    Clear height

    11.7 m

    Warehouse 2

    Total available space

    757,790 SQ FT (70,401 SQ M)

    Warehouse 2

    126,196 SQ FT (11.724 SQ M)

    Office

    10,548 SQ FT (980 SQ M)

    Technical rooms

    721 SQ FT (67 SQ M)

    Dock Doors

    15

    Level Access Doors

    2

    Car Park

    37

    HGV Parking

    8

    Floor Loading Capacity

    5tn/sqm

    Clear Height

    11.7 m

    OTHERS INFORMATION

    Appealing design

     

    Flexibility to suit operational requirements

     

    Structural frame designed to minimise columns and maximise operational efficiencies

     

    Provision of future docks where required

     

    Sustainable design features

     

    Energy-efficient fit out to reduce operational carbon footprint

     

    Structural design allows for site-specific alterations

     

    Spacious offices provide an optimal working environment

     

    Bright and welcoming reception area

     

    HGV yard depths are typically 35-54m deep

     

    Extensive HGV parking spaces provided on site

     

    Provision of ducts for future HGV charging

     

    Provision of car charging spaces and equipment

     

    Car parks and landscaping areas designed to provide a welcoming and sophisticated approach for staff and visitors

     

    Bicycle storage

     

    Safe separated access for cars/ HGV

     

    The warehouse will be designed in compliance with the main sustainability accreditation systems – particularly BREEAM, LEED, DGNB and to the principles of the WELL building standard

     

    Location

    Av. de Rafaela Ybarra, 7,
    28041 Madrid,
    Spain

    Destination Distance
    Madrid city center 19 m
    Madrid city center 40 m in bicycle
    Madrid city center 20 m in electrical bicycle
    Madrid city center 15 m in electrical bike
    Road accesses M-30, M-40 and M-50 ring roads
    Road accesses A-42 highway
    Metro Line 3
    Train Line C5
    bus EMT Lines 131 and 22

    Information about the Population :

    • Villaverde district: 145,523 inhabitants
    • Autonomous community of Madrid: 3.21 million inhabitants

    Dynamic region :

    At only 10km from Madrid city center, Villaverde district benefits from an extraordinary catchment area with over 4,400 businesses and a higher labor force than market’s average, making it a great last-mile location to any costumer.

    Road accesses :

    • Madrid M-30, M-40 and M-50 ring roads
    • A-42 highway

    Public transportation :

    • Metro (line 3)
    • Train (line C5)
    • Bus (EMT lines 131 and 22)

    Brochure

    G-Park Villaverde

    Contact Information

    Miguel Monreal

    SENIOR DEVELOPMENT DIRECTOR

    +34 607 183 492

    Questo sito utilizza i cookies per ricordare le preferenze. Per continuare ad utilizzare questo sito, acconsenti all'utilizzo dei cookies secondo la nostra cookie policy.
    Vedi la nostra cookie policy.